      玻璃鋼防腐管道安裝要求
      時(shí)間:2022-07-05  瀏覽:5792次

        Requirements for installation of FRP pipes

        1、玻璃鋼防腐管道在安裝前應(yīng)對(duì)設(shè)備管口、預(yù)埋件、預(yù)留孔洞、鋼結(jié)構(gòu)等涉及管道安裝的內(nèi)容進(jìn)行復(fù)核。

        1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

        2、管道的坡度應(yīng)按圖紙的要求進(jìn)行調(diào)整,調(diào)整方法可以利用支座達(dá)到坡度要求,焊縫應(yīng)設(shè)置在便于檢修、觀察的地方。

        2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

        3、與傳動(dòng)設(shè)備連接的管道,安裝前內(nèi)部要處理干凈,焊接固定管口一般應(yīng)遠(yuǎn)離設(shè)備,以避免焊接產(chǎn)生應(yīng)力對(duì)傳動(dòng)設(shè)備安裝精度的影響。

        3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

        4、管道與機(jī)器連接前,應(yīng)防止強(qiáng)力相對(duì),在自由狀態(tài)下檢查法蘭的平行度和同軸度。

        4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

        5、安全閥應(yīng)垂直安裝,在投入試運(yùn)行時(shí),要及時(shí)調(diào)校安全閥。安全閥的調(diào)校在系統(tǒng)上進(jìn)行,開(kāi)啟和回座壓力要符合設(shè)計(jì)文件的規(guī)定。

        5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

        6、閥門安裝前,按設(shè)計(jì)文件核對(duì)其型號(hào),并按介質(zhì)流向確定其安裝方向。當(dāng)閥門與管道以法蘭或螺紋方式連接時(shí),閥門應(yīng)在關(guān)閉狀態(tài)下安裝;如以焊接方式安裝時(shí),閥門不得關(guān)閉。

        6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

        7、儀表元件的臨時(shí)替代:所有儀表元件安裝時(shí),均采用臨時(shí)元件替代,等試壓、沖洗、吹掃工作結(jié)束后,投料前再正式安裝。

        7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


      主站蜘蛛池模板: 亚洲a成人无码网站在线| 熟久久| 日韩AV无码久久精品免费| 贵阳市| 99er精品视频| 国产精品黄色精品黄色大片 | 免费网站看sm调教视频| 日韩乱码人妻无码超清蜜桃| 偷窥少妇久久久久久久久| 国产精品推荐视频一区二区 | 永久免费的福利视频平台| 国产在线不卡一区二区三区| 97视频精品全国免费观看| 亚洲第九十九页| 5d肉蒲团之性战奶水| 91社网| 东方aⅴ免费观看久久av| 欧洲精品视频在线观看| 国产精品偷乱一区二区三区| 亚洲国产制服丝袜| 顶级欧美熟妇高潮xxxxx| 亚洲中文字幕一区二区| 一本色道久久88综合日韩精品| 亚洲日韩激情无码一区| 精品国产亚洲一区二区三区在线观看 | 2020年最新国产精品正在播放| 国产精品爽爽久久久久久无码| 黄色国产在线| 国产精品无码一区二区桃花视频 | 伊人成色综合网| 久久九九青青国产精品| 亚洲伊人久久综合影院| av中文观看| 在线观看国产精品日韩av| 国产一区二区免费不卡在线播放| 久久婷婷五月综合97色| 久久亚洲精品中文字幕无男同| 亚洲成人经典| 久久露脸国产精品| 人妻AV无码AV中文AV日韩AV| 国产精品自产拍在线18禁|